Kartoteka Igr Eksperimentov S Vodoj

Posted on
Kartoteka Igr Eksperimentov S Vodoj 3,5/5 9713 reviews

Uil'yam Berrouz. Port svyatyh. Steel panel radiator with right or left bottom connection. RADIK VKU is a steel panel radiator in VENTIL KOMPAKT version which allows left or right bottom connection to a pressurized heating system.There are no hangers welded at the back side of the radiator therefore.

DATE: 2009-03-16 domain: DETI-CLUB.RU nserver: dns1.yandex.net. Nserver: dns2.yandex.net. State: REGISTERED, DELEGATED, UNVERIFIED person: Private Person registrar: NAUNET-RU admin-contact: created: 2009-03-15T21:00:00Z paid-till: 2020-03-15T21:00:00Z free-date: 2020-04-16 source: TCI Last updated on 2019-02-18T17:46:30Z DNS INFO: NS: dns1.yandex.net internet address = 213.180.204.213 NS: dns2.yandex.net internet address = 93.158.134.213 MX: mx.yandex.ru internet address = 213.180.204.89. Free download mp3 songs english.

Steel panel radiator with right or left bottom connection RADIK VKU is a steel panel radiator in VENTIL KOMPAKT version which allows left or right bottom connection to a pressurized heating system. There are no hangers welded at the back side of the radiator therefore the radiators in types 21, 22 and 33 can be turned. Note: Type 33 VKU does not have symmetrically placed connections in relation to the depth of the radiator.

Eksperimentov

When mounting the radiator on the wall it is necessary to use the 'Compact bracket Plus' (see ). Height (H) 200, 300, 400, 500, 600, 700, 900 mm Length (L) 400, 500, 600, 700, 800, 900, 1000, 1100, 1200, 1400, 1600, 1800, 2000, 2300, 2600, 3000 mm Depth (B) - Type 21 VKU 66 mm - Type 22 VKU 100 mm - Type 33 VKU 155 mm Connecting pitch 50 mm Connecting thread 6 x G½ inside Highest allowed working pressure 10 bar Highest allowed working temperature (°C) 110 °C Radiator connection right or left bottom Pressure Loss In case of two-pipe heating system it is necessary to calculate and specify this in the project documentation to ensure a proper function of the heating system. This must be kept by the installer during installation of the heating system.